Category:
Air Conditioning
Date:
2015
Scope of Works
- We have allowed to supply and install new 27.7kw Actron split Ducted system to trading floor
- Remove 4 existing cassette indoor units on trading floor (Pearl room cassette A/C unit to stay)
- Crane and remove 3 existing outdoor units from roof of building.
- Supply and install new duct work and associated grilles.
- New outdoor unit to be located in easement between buildings at ground level.
- All Refrigeration pipe work as required.
- Condensate safety tray and all insulated drain pipe
- All associated electrical and controls
- Supply and install 3 new Tesonic air curtains to main shop front entrance.
- Test and commission




























